Staveley Mill Yard

Staveley Mill Yard

Staveley Mill Yard

Staveley Mill Yard is a four-acre site comprised of over 20 retail and industrial units, in the centre of Staveley village, it is situated near to both Kendal and Windermere and close to central Lake District. The PV installation will be installed across various buildings and the overall power generated from the 1533 solar panels works out at 574.78 kWp. We will also be installing 9 inverters which will be fitted into a container and 774 P801 optimizers which are connected to the solar panels. There were different designs of SolarEdge inverters installed such as the 27.6K, 82.8K, 25K, 55K and 50K.

It is estimated that this installation will produce about 1,500,000 kilowatt hours a day, but this does depend on how good the weather is. Staveley Mill Yard isn’t just in it for themselves either as there planning to give back to the community and help the rest of the Staveley village by exporting energy back to the grid. They estimate that they only use 1,100,000 kwh of their solar production which leaves them with 400,000 kwh to hand to the village.

Installed DC Power (kWp)

Max Achieved AC Power (kW)

Annual Energy Production (MWh)

CO2 Emission Saved (Tonnes)

Equivalent Trees Planted

The owner of Staveley Mill Yard David Brockbank was asked a few questions about the installation.

How do you feel about the project?

“Excellent, everyone should be doing it. I would like Staveley to be carbon neutral by 2030”

Is there anything else that you would like to say about the PV project?

“The village benefits hugely from the solar energy exported to the village. It would be good if we calculated the village’s carbon footprint and then worked on reducing it. I would be happy to help and share our knowledge and experience”

We are delighted that this project won an award at the Energy Efficiency Awards for being the Regional Large Scale Project of the Year.

The 2021 Regional Large Scale Project of the Year Award rewards one exceptional project, in each of the 11 Regional areas around the UK, where energy efficiency measures of more than £250,000 have been installed.

This award recognises the efforts of all those involved locally in delivering a successful large scale energy saving project, while maintaining excellent customer service that demonstrates a high standard of quality workmanship throughout the project.

You can find out more about this award by heading to the Energy Efficiency Awards website.

Technology

Solar Panel

Longi Solar LR4-60HPH x 1533

Warranty

12 Years Product Warranty

Efficiency

20.3 – 20.9%

Dimensions

1755 x 1038 x 35mm

Weight

19.5 kg

Inverter

Solaredge 27.6k x 1

Solaredge 82.8k x 2

Solaredge 25k x 2

Solaredge 55k x 1

Solaredge 50k x 3

Optimiser

P801 x 774

N/A

Make Enquiry

Please fill in your details below and we will be in touch as soon as possible

Agreement

1 + 8 =

Grosvenor Museum – 38.63 kWp Solar PV System

Grosvenor Museum – 38.63 kWp Solar PV System

Grosvenor Museum

Back in February, we were in the center of Chester at Grosvenor Museum installing the 38.63 kWp solar PV system. The museum decided to go solar to reduce its future energy bills and its carbon footprint as well as form part of a national program to assist the Government in achieving its 2050 net zero target. They hope that placing solar panels on its southern roof slopes will help achieve this goal.

We used 103 Longi Solar, LR4-60HPH-375M solar panels which were installed across three buildings. We connected two solar panels to every P801 optimizer and to complete the system we installed a SolarEdge 25k inverter inside the electrics room inside the museum.

The system is expected to produce around 30 MWh of energy every year and save 7 tonnes of carbon emissions which is equivalent to three hundred trees being planted. Grosvenor Museum is also looking to install six air source heat pumps on the rear roof slopes of the museum.

Installed DC Power (kWp)

Max Achieved AC Power (kW)

Annual Energy Production (MWh)

CO2 Emission Saved (Tonnes)

Equivalent Trees Planted

Grosvenor Museum

Grosvenor Museum is a museum based in the center of Chester which gives you the opportunity to explore the history of the city, its art and silver heritage, and its natural history. Find out about life during the Roman military occupation and visit the Period House, with rooms from the 17th century to the 1920s. There is a year round programme of special exhibitions and events, with an inspiring service for schools.

The Grosvenor Museum was built in 1885 to house the collections of the Chester Archaeological Society and the Chester Society of Natural Science, Literature and Art, together with schools of Science and Art. It was designed by the Chester architect Thomas Meakin Lockwood.

The museum is named after Hugh Lupus Grosvenor, 1st Duke of Westminster, who donated a portion of the site in Grosvenor Street and part of the building costs; the rest of the costs were met by public appeal.

At the rear of the museum you will find 20 Castle Street, the Museum’s Period House. The house was built around 1680 and its staircase with ‘barley sugar’ banisters dates from this time. It has been part of the Grosvenor Museum since 1955 and is now displayed as a sequence of nine period rooms dated from 1680 to 1925.

Technology

Solar Panel

Longi Solar LR4-60HPH x 103

Warranty

12 Years Product Warranty

25 Year Warranty for Extra Linear Power Output

Efficiency

20.6%

Dimensions

1755 x 1038 x 35mm

Weight

19.5 kg

Inverter

Solaredge 25k x 1

Optimiser

P801 x 52

Make Enquiry

Please fill in your details below and we will be in touch as soon as possible

Hawarden Castle Ground Mount Solar PV System

Hawarden Castle Ground Mount Solar PV System

Hawarden Castle Ground Mounted System

This 32.40 kWp solar PV system is our biggest ground-mounted system to date consisting of seventy-two Longi Solar, LR4-72HPH-450M solar panels connecting to one P950 optimizer for every 2 solar panels installed. The system was installed at a bit of a distance from the castle so it was wired up underground to avoid any trip hazards above the surface right through to the utility room in the castle where the SolarEdge 25k inverter would be installed on the wall. The system is estimated to produce around 30MWh of energy every year as well helping the environment by lowering their carbon footprint by 6.83 tonnes which is the equivalent to 313 trees being planted

Installed DC Power (kWp)

Max Achieved AC Power (kW)

Annual Energy Production (MWh)

CO2 Emission Saved (Tonnes)

Equivalent Trees Planted

Benefits of a Ground-Mounted Solar PV System

The great thing about ground mounted solar arrays is that they are beneficial to all homeowners. Even if you are an eligible candidate for a rooftop solar panel system, there are many benefits to selecting a ground mounted solar array instead.

Firstly, the ground mounted solar systems are incredibly easy to place. This is due to that fact that they can be placed on open land. No drilling into your roof is required at any stage, and the bracings that are used in these systems are easy to remove as well as lightweight. In the pole mount system, the bracings tend to be a little heavier and more securely installed.

Hawarden Castle

The name Hawarden Castle is probably better known as the grand stately home of W.E. Gladstone, former British Prime Minister, which is not open to the public. However, nestled in the lovely, albeit at times marshy, wooded park associated with Gladstone’s home, the extensive remains of Hawarden “Old” Castle may be explored by entering an unobtrusive stone archway in the town’s center. While not of Welsh origin, Hawarden Castle played a key role in the wars for independence of the 13th century.

Nower days there is a farm shop nearby as there is thousands of acres of field to plant and grow various different fruit and veg and even have a cafe where you can sit and enjoy a nice cup of coffee.

Technology

Solar Panel

Longi Solar, LR4-72HPH-450M x 72

Warranty

12 Year Warranty for Materials and Processing
25 Year Warranty for Extra Linear Power Output

Efficiency

20.7%

Dimensions

2094 x 1038 x 35mm

Weight

23.5kg

Inverter

SolarEdge25K x 1

Optimiser

P950 x 36

Make Enquiry

Please fill in your details below and we will be in touch as soon as possible

Agreement

13 + 13 =

Bolney Wine Estate, Sussex – PV Installation

Bolney Wine Estate, Sussex – PV Installation

Bolney Wine Estate

Genfit have designed and installed a 59.4kWp solar PV array across two roof spaces, following the construction of a new winery, at Bolney Wine Estate in Sussex.

The system installation was a community funded project by Brighton Energy Cooperative.  The energy generated will be sold to the winery at a lower rate than regular fossil fuel generated power through a PPA (power purchase agreement.

The system benefits from dual module level system monitoring, through Solaredge panel optimisation.  This helps towards providing detailed data and analysis on the PV systems performance through the Solaredge Monitoring Portal.

198 PV modules were installed in total, providing an estimated annual generation of 63.6MWh.

The array is greatly reducing the winery’s usage of energy from fossil fuel, creating a saving of 28.57 tonnes of harmful CO2 emissions each year.

Installed DC Power (kWp)

Max Achieved AC Power (kW)

Annual Energy Production (MWh)

CO2 Emission Saved (Tonnes)

Equivalent Trees Planted

Technology

Solar Panel

JA Solar x 90

BYD x 108

Warranty

JA Solar: – 80% Power Output Warranty Period 25yrs – 90% Power Output Warranty Period 12yrs – Workmanship Warranty Period 12yrs

BYD: – 12 years for product – 25 years linear Warranty

Efficiency

JA Solar: 18.94%

BYD: 16.9%

Dimensions

JA Solar: 1678mm x 991mm x 35mm

BYD: 1645mm x 992mm x 35mm

Weight

JA Solar: 18.5kg

BYD: 18.7 kg

Inverter

Solaredge 25k x 2

Optimiser

P600 x 54

P730 x 46

Make Enquiry

Please fill in your details below and we will be in touch as soon as possible

Agreement

15 + 6 =

Brio Neston Sports Centre 60kWp of Community Energy

Brio Neston Sports Centre 60kWp of Community Energy

Brio Neston Sports Centre 60kWp of Community Energy

In February 2020 Genfit delivered a 60kWp community funded PV system at Neston Recreation Centre on behalf of Chester Community Energy, in partnership with Brio Leisure and CWAC.  This was the culmination of 12 months of preparation, planning and fund raising and resulted in two sites being successfully installed by Genfit in just 9 consecutive working days.  The solar generated will be supplied to the centre under a power purchase agreement, resulting in significant cost saving’s to the centre and provides an income to CCEL.

  CCEL able to re-invest in community energy saving projects and develop further sites

  Significant cost savings for the centre

  System estimated to generate 48,000kWh in the first year

  Predicted to save 560 tonnes of CO2 emissions over 20 years

Technology

Solar Panel

LR6-60PB-300M x 1271

Warranty

10 Year Warranty for Materials and Processing

25 Year Warranty for Extra Linear Power Output

Efficiency

18.3%

Dimensions

1650 x 991 x 40mm

Weight

18.5 kg

Inverter

Solaredge 27.6k x  1

Warranty

12-20 Year Warranty

Optimiser

P600 x 638

P700 x 1

Make Enquiry

Please fill in your details below and we will be in touch as soon as possible

Agreement

9 + 11 =